Billingshurst Images
At this stage, foundations had been dug and we were preparing to cast our reinforced concrete slab.
In one say a total of seventy-two tonnes of concrete were poured over the reinforced metal frame.
A structural timber frame was then erected.
Once the timber frame was put in place, work could begin on the trust roofing system.
Oak panelling was secured to the structure to achieve the desired effect.
Decorative crux were added to the front of the garage.
Landscaping work was completed in the surrounding area as per the terms of our contract
The completed project.